Matt Elson : The Infinity Boxes

Infinity Ship Creation Timeline

20180118_114734a_y800

Winston Fisher, Matt Elson and Michael Benneville. Winston is the geniurs builder and Michael is the visionary genius of Area 15. These first photos are at the announcement of Area 15 in Las Vegas.

20180118_093405a_y800

20180118_114122a_y800

Joshua Levine, my manager and CEO of Fired Up Management, Chakra Khan, my wife and me.

IMG_8239a_y800

INFS01_ShanghaiMetalCorp_4_y800

ON the factory floor of Shanghai Metal Corporation

INFS01_ShanghaiMetalCorp_3_y800

Double doors at both ends.

INFS01_ShanghaiMetalCorp_1_y800

IMG_0882_y800

Off loaded in Long Beach, CA

IMG_0884_y800

IMG_0887a_y800

Ready for delivery to the Mojave Desert

IMG_9758a_y800

20180606_073818a_y800

Prepping the site for the ship.

20180605_125047_y800

Michah Electric and our water level. The water level is an ancient tool and super precise over any distance.

IMG_4096a_y800

IMG_4115a_y800

IMG_4206a_y800

IMG_4214a_y800

20180613_163437_y800

IMG_6148a_INFS01_Rainbow_y800

20180613_164125_y800

IMG_4396a_y800

IMG_4401a_y800

IMG_4493a_y800

IMG_4543a_Matt_Portrait_y800

IMG_4599a_InitialLayout_y800

IMG_5287a_y800

The crossbars held the blued panels in place.

IMG_5288a_y800

Carveouts were carefully made to keep the factory attachpoints available.

IMG_5293a_y800

Screws were added so the crossbars would apply weight in the upper portion and then press down to create a solid glue joint to the wall.

IMG_5311c_y800

IMG_5314a_y800

IMG_5399a_y800

IMG_5419a_y800

IMG_5482a_y800

20180628_054345a_y800

20180701_103604a_Matt_Portrait_y800

IMG_5697a_y800

The doors were a project in and of themselves. The crossbar braces were held in place by tying ropes to the contaner attachment points and pulling them down and into place.

IMG_5702a_y800

IMG_5729a_y800

Truckers knots are the standard tie off, they can be loosly put in place and then synched up to apply pressure.

IMG_5745a_y800

IMG_5747a_y800

IMG_6114a_y800

IMG_6117a_y800

IMG_5737a_y800

Once the glue was dried the 'no screw areas' were painted orange

IMG_6132a_y800

IMG_6143a_y800

20180708_132842_INFS01_Floor_Plan_y800

20190604_184334a_INFS01_Interior_y800

20190606_200621a_y800

20190610_220424a_y800_3

Hard rubber mats were added to the floor as a vibration dampener for travel and as an insulator.

20190616_161425a_y800

20190619_192640a_y800

The support ribs went in.

20190619_192707a_y800

Ribs were mortised and then screwed together

20190713_210903a_y800

The deiling elements were made with laser cut plexiglass. The LED lights were hand stitched on through lase cut holes

20190713_210921a_y800

20190714_074406a_y800

20190714_075251a_y800

20190718_141156a_y800

20190730_073014

4 layers of insulating paint were used on the outside, This is the first layer.

20190801_200621a_Isulation1_y800

20190801_200905a_y800

This is four layers in.

20190926_172306b_y800

The entry doors take their inspiration from the sunsets here.

20190926_184248a_y800

20191010_184908a_ExitDoor_y800

20191011_121039a_y800

20191022_130607a_y800

The insulation was covered with fire retardant RFP

20191023_134928a_y800

The main control area was backed with plywood so that we could freely mount additional in this area.

IMG_7268a_y800

20191024_162536a_y800

IMG_7278a_y800

20191106_110858a_y800

IMG_7320a_y800

IMG_7340a_y800

IMG_7327a_y800

IMG_7360a_y800

IMG_7363a_y800

IMG_7364a_y800

IMG_7373a_y800

IMG_7377a_y800

20191112_145448a_y800

IMG_7401a_y800

IMG_7484a_y800

IMG_7497a_y800

IMG_7637a_y800

20191118_165302a_y800

20191118_165331a_y800

20191119_163308a_paint_y800

20191202_113611a_y800

20191202_113722a

20191202_113755a_y800

20191202_114423a_y800

IMG_7664a_y800

IMG_7709a_y800

IMG_7715a_doorEdge_y800

20191204_122851a_y800

20191204_123919a_y800

20191204_130942a_y800

IMG_7726a_y800

IMG_7731a_y800

IMG_7737a_y800

IMG_7768a_y800

20191205_120041a_y800

20191205_120126a_y800

20191205_121253a_y800

IMG_7819a_y800

IMG_7856a_y800

IMG_7902a_y800

20191207_094603a_y800

IMG_7913a_y800

20191207_210649a_y800

20191208_150944a_y800

20191208_151041_021a_y800

IMG_7927a_y800

Bill Clark, Lighting Director. Bill did an amazing job of writing a custom lighting controller from scratch.

20191218_125906a_y800

20191218_125939a_y800

20191218_191936a_y800

20191219_122250a_y800

Aise Born, Exterior Painting

20191219_140040a_y800

IMG_8140a_y800

IMG_8160a_y800

20191221_113935a_y800

IMG_8166a_y800

20191221_212809a_y800

Experiments went on with painting on the interior mirrors in order to paint in 3 dimensions

IMG_8185a_y800

The levels of complexity were fantastic. However, in the end the glass was wiped clean. An experiment for another ship perhaps.

IMG_8194a_y800

20191223_133216a_y800

20191224_111807a_y800

20200104_154651_INFS01a_y800

20200104_154854_INFS01a_y800

20200104_170917_INFS01a_y800

20200104_171205a_y800

20200106_164338_INFS01a_y800

Sobe Walker, Build Lead

IMG_8273a_y800

20200106_204333a_y800

IMG_8337a_y800

IMG_8340a_y800

20200122_164429a_Matt_Portrait_y800

IMG_8354a_y800

IMG_8360a_y800

IMG_8361a_y800

IMG_8363a_y800

20200124_183033a_y800

20200125_125637_INFS01a_y800

20200125_164942_INFS01a_y800

20200216_164635_y800

20200216_164935_y800

20200227_151515_y800

IMG_8407a_y800

20200312_084933a_y800

20200404_093355_y800

20200410_162614_y800

20200411_181011_y800

20200414_113659_y800

20200415_181004a_y800

20200417_160241_y800

20200418_131751a_Auggie_y800

20200420_055540_y800

20200421_122846a_y800

20200421_123043_y800

20200421_123116_y800

20200422_182435_y800

20200422_182745_y800

20200423_111657a_y800

20200423_111805_y800

20200423_111706_y800

20200504_102627a_y800

20200504_140629a_y800

20200504_155134

20200504_185335_y800

20200504_185547_y800

20200504_185620_y800